X

Alcatel-Lucent shows off undersea cable ship

The telecoms equipment maker gave ZDNet UK a tour of the Ile de Batz, one of its three dedicated cable-laying ships, along with its Greenwich cable component factory
alcatellucentship1.jpg
1 of 13 David Meyer/ZDNet

The Ile de Batz is one of three dedicated ships Alcatel-Lucent uses to lay the submarine fibre-optic cables that carry broadband connectivity across the oceans.

The ship is usually based in Calais, but is in Greenwich now, picking up components from Alcatel-Lucent's factory. On Thursday, the telecommunications infrastructure firm invited ZDNet UK to see the factory and the ship, and have a look at a vital part of the global internet that's normally hidden by miles of water.

The Ile de Batz usually spends between 30-40 days at sea on each voyage. It can lay up to 200km of cable per day, in normal conditions, to a depth of about 8km. That cable and its components is expected to have a lifespan of around 25 years.

alcatellucentship4.jpg
2 of 13 David Meyer/ZDNet

Here, a member of the ship's crew shows off the various thicknesses of cable that are deployed from the Ile de Batz.

The different sizes are used at different depths, although surprisingly the larger diameters are used closer to the surface. The top example in this picture is the lightweight cable that Alcatel-Lucent uses in very deep oceans, where ships' anchors pose no threat. The shallower the waters, the more heavily-armoured the cable needs to be, as depicted in this progression of thickness.

If cut, the cable can be repaired — Alcatel-Lucent has more ships on standby around the world for this purpose — but each reconnection degrades the system gain of the cable. The system is designed with enough headroom to tolerate a certain number of repairs.

alcatellucentship6.jpg
3 of 13 David Meyer/ZDNet

This is the cable-splicing machine used on board the Ile de Batz — one of the most delicate and precise pieces of equipment on a ship laden with very heavyweight gear.

alcatellucentship5.jpg
4 of 13 David Meyer/ZDNet

This machine moulds protective layers on to the cable. The ship acts as much as a factory and repair shop as a straightforward spooler-out of cable; each leg of a cable requires a lot of individual customisation.

alcatellucentship3.jpg
5 of 13 David Meyer/ZDNet

Here is one of the Ile de Batz's two main cable tanks, with a small amount of spare 17mm cable included for the benefit of those touring the ship.

Each of the ship's two cable tanks can hold up to 5,500km, or 3,000 tonnes, of fibre-optic cable. There are also two spare tanks, each with a 250-tonne capacity.

alcatellucentship7.jpg
6 of 13 David Meyer/ZDNet

This is the linear cable engine used to feed cable from the tanks to the rear of the Isle de Batz, from where it descends to the briny depths.

alcatellucentship8.jpg
7 of 13 David Meyer/ZDNet

This massive and surreal device is the Isle de Batz's plough, which is used to bury cable.

The cable can be buried up to 3m under the sea bed, which happens in waters up to 1.5km deep. This is the limit of what those in the industry consider to be 'shallow' waters — areas where fishing takes place, and cables need to be especially well protected.

alcatellucentship9.jpg
8 of 13 David Meyer/ZDNet

The Ile de Batz has all of the normal navigation and engine systems of any large vessel, but with the addition of specialist controls shown here.

These are separate from those used for the main navigation and cable-laying functions of the Ile de Batz, and use precision sensors and computers to calculate the strength of the sea and the wind to exactly control the ship's movement during cable deployment.

alcatellucentship2.jpg
9 of 13 David Meyer/ZDNet

This is Alcatel-Lucent's Greenwich factory — the same site where part of the first transatlantic cable was built in the mid-19th century.

These days, the factory is used to build three particular pieces of cable kit: repeaters, branching units and power feed equipment.

alcatellucentship10.jpg
10 of 13 David Meyer/ZDNet

This is one of Alcatel-Lucent's repeaters, which are used to amplify the signal at various points along the cable.

This repeater, a model from two years ago, has a throughput of around 1.5 terabits per second.

alcatellucentship12.jpg
11 of 13 David Meyer/ZDNet

Alcatel-Lucent also makes branching units at its Greenwich facility.

This is the component that would be used to split off connectivity to a site that the cable passes by — for example, to Congo on the West Africa Cable System (WACS), which runs from the UK to South Africa, that Alcatel-Lucent is building.

alcatellucentship11.jpg
12 of 13 David Meyer/ZDNet

This power feed equipment, produced at Alcatel-Lucent's Greenwich facility, is destined to be deployed where the WACS line comes ashore in Congo. This is the kit that powers the repeaters along a submarine cable.

alcatellucentship13.jpg
13 of 13 David Meyer/ZDNet

Philippe Dumont is in charge of Alcatel-Lucent's submarine network business.

According to Dumont, the market for such deployments has remained "quite stable" over the last couple of recessionary years, which "came as quite a surprise" to Alcatel-Lucent.

Dumont said the biggest cabling project in the world right now is Africa, but the connectivity being deployed there will be quite different to that people in the UK are used to. "Access to the internet in Africa is mostly based on mobile," he said. "You will not see DSL, but you will see mobile broadband through smartphones and USB dongles."

The biggest part of the traffic in such a deployment will come from consumers, followed by enterprise customers such as banks who have been somewhat cut off from the world's internet infrastructure until now.

A big cable deployment can be worth around half a billion dollars, so telecoms operators tend to invest in such projects through consortia, rather than on their own. According to Dumont, the competition between consortium members will drive down prices for end-users.

Dumont said he expects the big African deployment to wind down around 2012 for the cable part, after which it a second wave of transmission backhaul will be rolled out.

"We think Asia will be next — there is [capacity] but not so many connection points," Dumont said. "China has a lot of needs, as do small countries like Vietnam. The west of Australia also has very little connectivity."

Related Galleries

Cybersecurity flaws, customer experiences, smartphone losses, and more: ZDNet's research roundup
shutterstock-1024665187.jpg

Related Galleries

Cybersecurity flaws, customer experiences, smartphone losses, and more: ZDNet's research roundup

8 Photos
Inside a fake $20 '16TB external M.2 SSD'
Full of promises!

Related Galleries

Inside a fake $20 '16TB external M.2 SSD'

8 Photos
Hybrid working, touchscreen MacBook hopes, cybersecurity concerns, and more: ZDNet's tech research roundup
Asian woman working at a desk in front of a computer and calculator

Related Galleries

Hybrid working, touchscreen MacBook hopes, cybersecurity concerns, and more: ZDNet's tech research roundup

8 Photos
Developer trends, zero-day risks, 5G speeds, and more: Tech research roundup
Person seated at a booth in a cafe looks at their phone and laptop.

Related Galleries

Developer trends, zero-day risks, 5G speeds, and more: Tech research roundup

10 Photos
Drive Electric Day: A dizzying array of EVs in sunny Florida
ca3b4019-26c5-4ce0-a844-5aac39e2c34b.jpg

Related Galleries

Drive Electric Day: A dizzying array of EVs in sunny Florida

16 Photos
Incipio, Kate Spade, and Coach cases for Samsung Galaxy S22 Ultra: hands-on
s22-ultra-incipio-coach-cases-2.jpg

Related Galleries

Incipio, Kate Spade, and Coach cases for Samsung Galaxy S22 Ultra: hands-on

15 Photos
Casetify Impact Crush Galaxy S22 Ultra case hands-on: in pictures
casetify-s22-ultra-3.jpg

Related Galleries

Casetify Impact Crush Galaxy S22 Ultra case hands-on: in pictures

10 Photos